|
Mobile
Computer Classrooms/GMC Bus Mobile Dental Lab/Office
Local 99-Union PAC Telecommunication/Rallye Stages
|
|
|
|
|
|
|
Dinuba
Unified Elem.Compu-tech |
Starting |
wiring the lights/plug strips |
Countertop/plug strips |
|
|
|
|
|
|
125 amp - 1/2 of the service |
250
amp service |
30KW Diesel Generator |
Coach
Heater |
|
|
|
|
|
|
Generator aircooled intake fan (before grill) |
100KW load test machine |
Fresno Unified CompuLab |
32 computer stations |
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
Dental
Office |
Wheel
Chair Lift |
|
| |
|
|
|
|
|
|
|
|
|
20
ft. slideout stage 4000 # capacity |
Framing |
support
framing |
Slideout
rails |
|
|
|
|
|
|
Extended
stage |
Wrico
20 KW diesel generator |
Stage
construction |
Stored
for travel |
| |
|
|
|
|
|
|
|
|
|
3rd
Stage produced for Local 99 Union |
front
view |
Removeable
Stairs and Railings |
Side
view |
|
|
|
|
|
|
45'
semi-trailer |
1/2
(10') extended |
side
view |
Closed
sections of stage |
|
|
|
|
|
|
Undermounted
storage box for rails and stairs |
Stair
storage open |
Storage
box closed |
Pins
holding railings together |
|
|
|
|
|
|
Spring
locks holding secure extended and retracted |
Support
Legs |
Support
Legs stored |
Framing
structure |
| |
|
|
continued on Pg 3 |
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|